Azure Front Door architecture and certificates
- Technical challenge
- Rationalize domain publishing and certificate lifecycle without interrupting application journeys.
- Solution
- Front Door architecture, domain migration, managed certificates and Terraform-based Azure configuration.
100+domains moved to Azure Front Door; over €40k annual savings on the relevant scope
Read the case study ↗BigQuery FinOps and query optimization
- Technical challenge
- Attribute spending to BigQuery workloads and reduce scans without changing analytical results.
- Solution
- SQL analysis, partitioning and clustering on targeted workloads; daily GCP cost monitoring through Power BI.
−35%cost reduction on optimized BigQuery workloads; not the whole cloud bill
Read the case study ↗GitLab platform and CI/CD execution
- Technical challenge
- Control platform spending without transferring risks to maintenance, backups and CI/CD capacity.
- Solution
- GitLab architecture on GCP, autoscaled GKE runners deployed with Helm and upgrade validation in ephemeral staging.
≈−90%spending on the GitLab platform scope concerned, excluding full GCP/CI/CD costs
Read the case study ↗Platform engineering and CI/CD
- Technical challenge
- Converge three delivery chains without confusing their environments with the hundreds of pipelines to standardize.
- Solution
- Per-application YAML, shared Jenkins/Groovy logic, common controls and support for Kubernetes migrations.
500+standardized pipelines; deployment time from about two days to one hour for the releases concerned
Read the case study ↗